How we build

From the first call
to the keys.

What happens from the first phone call to the day you get the keys, and what you get in writing along the way.

  1. The Craftsman’s plan set out on the cleared lot (design drawing; the rendering is in progress)NGA design · Drawing
    01

    The first call

    Call, or send the estimate form with a few photos of the lot or a plan you like. We ask where you are starting — land, plans, budget, timing — not to hold you to anything, but so the first meeting is useful.

    Then we set a time to meet, at the lot if you have one.

  2. The Craftsman’s foundation: footings, block crawlspace walls and piers (design drawing; the rendering is in progress)NGA design · Drawing
    02

    The lot walk

    We walk the land with you: where the house can sit, how the ground slopes and where the water goes, whether there is sewer or it will need septic, water or a well, power, and how far the driveway has to run. This is where the site-work surprises get found — before anyone prices a house.

    The visit and the estimate are free, and there is no obligation.

  3. The Craftsman framed: walls and rooms standing on the subfloor (design drawing; the rendering is in progress)NGA design · Drawing
    03

    Plans and your written estimate

    We work from your architect’s plans, a stock plan adjusted to your lot, or a sketch. Finishes are chosen at a level that fits the budget, with allowances for anything you have not picked yet.

    You get the estimate in writing, line by line — the site work separate from the house — with a realistic schedule. If it is over budget, we show you where the money goes and what can change.

  4. The Craftsman under roof: trusses, sheathing and the windows in (design drawing; the rendering is in progress)NGA design · Drawing
    04

    Contract, permits and site work

    The contract matches the estimate and sets out a payment schedule tied to stages of the build, so you never pay far ahead of what is built. Where there is no sewer, the state septic permit comes first; then the building permit. The lot is cleared and graded, and the driveway and utilities come in. Long-lead items like windows are ordered early, because they set the pace.

  5. The Craftsman finished outside (rendering)NGA design · Rendering
    05

    The build

    Nick runs the job on site. Footings, foundation, framing, the roof and windows, then the plumbing, electrical and HVAC rough-ins — coordinated with the trades the house needs — and each stage is inspected before the next one starts. You get updates at every stage, and photos of what is inside the walls before insulation and drywall cover it.

    If something comes up, we stop, show you, and price the options in writing before doing anything extra.

  6. The Craftsman at dusk, lit, home (rendering)NGA design · Rendering
    06

    The walkthrough, the keys — and after

    After the final inspection we walk the house with you and make a list of anything that is not right. Then we fix the list and hand you the keys. And if something comes up after you move in, call us — we come back.

Questions

About the process.

Is the first consultation free?

Yes. We meet with you, walk the lot if you have one, talk through the house you want and the budget you have in mind, and then send a written, line-item estimate — free and with no obligation. It is written to be compared with anyone else’s, line by line.

Do I need house plans before I call?

No. Some clients come with an architect’s plans, some with a stock plan they like, and some with a sketch and a list of rooms. We can work from any of those, and the lot often shapes the plan more than people expect.

Who handles the permits?

A new house needs a building permit and inspections at each stage. Where there is no public sewer, South Carolina also requires a septic permit from the state Department of Environmental Services before the building permit can be issued. Inside city limits the permit usually comes from the city — Inman, Spartanburg, Greer and Greenville each issue their own; outside them, from the county. At the estimate we tell you exactly which permits and inspections your house needs and how they will be handled, and the fees are written into the estimate.

How do payments work?

Your contract sets out a payment schedule tied to stages of the build — foundation, framing, dry-in and so on — so you are not paying far ahead of what has been built. If you are using a construction loan, tell us at the start: the lender will have its own draw schedule and inspections, and the contract should line up with them. We accept Visa, Mastercard, American Express, Discover, Debit, Cash, Check, Zelle, Venmo and PayPal.

What if I want to change something during the build?

Tell us as early as you can. Every change gets a written price and its effect on the schedule before any work starts, and nothing is added to your bill without your say-so. If we find a problem on site, we stop, show you, and price the options the same way.

How long does it take to build a house?

Several months on site is typical. Weather, permits and special-order items like windows and cabinets can add to it, so we order early. Your estimate includes a schedule, and you will know where the house stands at each stage.

Free estimate · about two minutes

Tell us what you are building.

Free estimate request

What are you building?

Choose one — you can tell us more in a moment.

Where are you starting?

Choose the closest.

The project, the timing and the budget

Rough answers are fine. A budget range helps us suggest what fits it, instead of guessing.

Do you have plans?
About how big a house?
About how big?
What kind of addition?
How big a change?
What would you like outside?
When would you like to start?
Budget for the house, not counting land (optional)
Budget (optional)
Budget (optional)
Budget (optional)
Budget (optional)

Tell us about it

A few sentences and a couple of photos — the lot or the room, a plan, or a house you like — tell us more than a long phone call, and make the first meeting a real one.

Photos of the lot, the house, plans or inspiration — up to 6, optional

How do we reach you?

We use this only to talk about your project. No mailing lists, no selling your details.

Best way to reach you

Rather talk? (864) 937-0415 · Mon–Fri 8:00 AM – 8:00 PM